VERIFY BEFORE SHIPMENT

Factory Acceptance Testing and Pre-Shipment Inspection

FAT and pre-shipment inspection verify agreed equipment characteristics, available functions, accessories, documentation, packing and shipment readiness against an approved inspection scope.

Visual placeholder

Inspector checking industrial machinery during FAT with a checklist, nameplate and test environment.

Who this service is for

  • Machinery approaching completion
  • Buyers paying a balance before shipment
  • Configured or custom equipment
  • Projects requiring documented acceptance checks

Typical deliverables

  • Inspection checklist
  • Photo and video record when permitted
  • Observed test results
  • Nonconformity list
  • Corrective-action follow-up
  • Shipment-readiness recommendation

Scope

What is Included

Inspection scope preparation

FAT coordination

Visible specification checks

Functional test observation where applicable

Accessory and documentation review

Nameplate and quantity checks

Packing preparation review

Nonconformity and corrective-action tracking

How it works

A Clear Working Process

01

Plan

Define what can be checked, tested and documented.

02

Inspect

Conduct or coordinate the agreed verification activities.

03

Report

Record findings and deviations with supporting evidence.

04

Close

Track corrections and support the buyer's shipment decision.

Frequently Asked Questions

Is every machine testable at the factory?

Not always. Some performance tests require the buyer's materials, utilities or final site conditions. The inspection scope must state practical limitations before the visit.

Does an inspection replace the manufacturer's warranty?

No. Inspection documents observed conditions at a point in time and does not replace contractual warranty obligations.

Need support with this service?

Share the equipment, current project stage, destination market and any specifications or quotations you already have.

Tell us about your project